It only took four weeks of on-and-off work and innumerable trips to Home Depot and Sherwin Williams, but my wife finally has the third floor bath she’s always wanted. The rehab included: new tile flooring, wainscoting, a new vanity, restoration of our clawfoot tub, a new chrome “telephone” tub faucet and paint. Lots of paint.
I’ll hold off the full reveal until we install the vanity and decorate the space, but for now here is a quick sneak peak: